Watering plant of the Middle Valtellina
Project phases were aimed at improving in water management for agricultural purposes as follows:
- the up-grading of cathode protection irrigation systems in the areas of Tresivio, Ponte in Valtellina, Piateda, Chiuro, Teglio, Bianzone and Villa di Tirano;
- the substitution of regulation and control machinery at the “S.Rocco” storage point and Intermediate work on the Valfontana river;
- flow measurement and minimum hydraulic power requirement system installation at Rhon and Valfontana in Ponte in Valtellina and Tresivio;
- re-activation of flow measuring stations at the Boalzo river in Bianzone.
Data sheet
- client: Consorzio di Miglioramento Fondiario Sponda Soliva – Ponte Valtellina (SO)
- location: Ponte Valtellina, Chiuro, Bianzone, Villa di Tirano
- type of intervention: cathode protection up dating; piping, water regulation and management, positioning and start-up of measurement and monitoring systems
- planning: 2009-2010
- realisation: 2010-2011
- activities: Planning, on site management, safety co-ordination
Category: Technical systems and large-scale projects
Valtellina Cultural District
The Valtellina cultural district project is a long term plan co-financed by the CARIPLO foundation aiming at valorising cultural heritage as a mile stone toward...
New ringroad in Tirano (SO)
In the project to improve access to the Valtellina area, Lombardy regional council and ANAS S.p.A. (Italian highways agency), drew up the SS.38 Tirano tender. T...
High Voltage rationalisation programme in Media Valtellina
In the project to increase performance of the electricity network, a new 380 kV power line would be set up with Italo-Swiss interconnectivity in S.Fiorano (BS) ...