posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Structure › Sondrio railway station pedestrian underpass - structure

Sondrio railway station pedestrian underpass - structure

Sondrio railway station pedestrian underpass - structure

Previous Next

The project focused on the question of the creation of a transport interchange in Sondrio and the requalification of the areas around the station implementing a pedestrian pathway under the passenger station, platforms and via Tonale, connecting Piazza Bertacchi (the station square) with the bus station, multi-storey car park and school campus south of the rail line.

Differing construction techniques were necessary due to the restricted space allowable for working near the station.

The “tube push” method was necessary for the construction of the underpass, because the 4 tracks were mantained in use. The foundations of the passenger building were carried out through the temporary support of the building façade by using geotechnical R.C. poles.

All work was carried out without interrupting normal rail traffic flow, full functioning of the ticket office and station services in general.

To complete the project, access roofing was installed.
The escalator covering at the entrance in Piazzale Bertacchi was made in steel and glass sheeting secured with circular fasteners.
The access point on the second entrance was made in steel with a wooden beam structure.

Data sheet

  • client: Sondrio city council
  • location: Sondrio
  • type of intervention : pedestrian underpass construction under the railway station, the tracks and the road
  • planning: 2005-2006
  • realisation: 2006-2010
  • activities: structural planning and construction supervision
  • architectural project: Angelo Bugatti Architect -Milano, Studio A3 Associated Architects – Tirano (SO)
Rail infrastructureRail infrastructure
Other projects

Category: Structure

Besta Palace in Teglio (SO) – structural improvement of wooden ceiling structure

Besta Palace in Teglio (SO) – structural improvement o...

The planning of the structural improvement of the wooden structures on the second floor of the west wing of Besta Palace started from the thorough study of thei...

S. Maria Maddalena church in Bellusco (MI) - structural improvement

S. Maria Maddalena church in Bellusco (MI) - structural impr...

Due to the poor characteristics of the soil, the foundations of the S. Maria Maddalena church had to be reinforced, this along with a major dehumidification pro...

Bellaguarda castle in Tovo (SO) - structures

Bellaguarda castle in Tovo (SO) - structures

The castle ruins were restored as a first step, to allow their touristic fruition. The foundations were reinforced with curbs in reinforced concrete. Elevated ...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab