posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Safety coordination › Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)

Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)

Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)

The enlargement of the plants “Baggio” in Settimo Milanese (MI), “Cedegolo” (BS), and “Stazzona” in Villa di Tirano (SO), aimed at increasing plant safety and stability while also fulfilling all service requirements and guaranteeing the safety of operators.

All figures responsible for the various aspects of area management, site management, equipment and movement were identified and checked as to conformation with the relevant legislation and with the documentation issued from the client: “management and prevention of electrical hazard”

The proximity and distance limits allowed for a reduction in the quantity of work to be done under supervision, with off limits sections of the plant reduced to those strictly foreseen by the project within the distance limit, increasing operator awareness of potential dangers, thus, implementing real safety at work.

The project required highly specialized operators: localized demolition and civil engineering, reinforced concrete prefabricated assembly, metal structure and workstation assembly, assembly and testing of tri-phase fuse-boxes, SF6 switches, electro-mechanical equipment with treatment of potentially polluting and dangerous substances, local network cabling and local and remote control panel management. 

Considering the wide number of contractors involved in the work, the project manager required complete control form Health & Safety co-ordinator and full interface between the site manager, works manager and operational team.

Data sheet

  • client: TERNA RETE ITALIA spa - Roma
  • location: Settimo Milanese (Mi), Cedegolo (BS), Villa di Tirano (SO)
  • type of intervention: electrical energy transmission and distribution
  • activities: Health & Safety co-ordination during planning and work execution
  • period: 2012 - 2016
Energy infrastructureEnergy infrastructure
Other projects

Category: Safety coordination

“Sociale” theatre in Sondrio - Health & Safety co-ordination

“Sociale” theatre in Sondrio - Health & Safe...

The site had safety issues in terms of: · its location in the very centre of the city; · limited space available for equipment installation and loading/un...

Edipower hydro-electric power station in Mese (SO) and accessorial services

Edipower hydro-electric power station in Mese (SO) and acces...

During hydro-electric plant re-powering at the Mese plant, Foppoli Moretta e Associati was responsible for safety co-ordination and operations in: internal p...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab