posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Energy infrastructure › Hydro-electric power plant in Mese (SO)

Hydro-electric power plant in Mese (SO)

Hydro-electric power plant in Mese (SO)

Previous Next

During the re-powering operations at its hydro-electric plant of Mese, the client requested external consultants to carry out the following operations:

  • modernization of machinery plant, the historical area of the building, material movement and machinery installation services;
  • completion of documentation necessary for renewal of power capture operations on Boggia river (Gordona-SO) and on Crezza river (Menarola-SO) all within the border of the "nature 2000 programme" of Val Bodengo (SIC code IT2040040);
  • Health & Safety compliance in areas of potential explosive risk (ATEX);
  • Health & Safety co-ordination planning for maintenance in specific plant areas.

Data sheet

  • client: EDIPOWER s.p.a. - Sesto S. Giovanni (MI)
  • location: Mese, Gordona and Menarola (SO)
  • type of intervention: works to be carried out during substitution of generators sets at the Mese hydro-electric plant, maintenance of power capture equipment on the Boggia and Crezza rivers
  • period: 2006 - 2009
  • activities: executive project, environmental impact report, normative compliance checks, Health & Safety co-ordination during planning
Energy infrastructureEnergy infrastructure
Other projects

Energy infrastructure

Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)

Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)

The enlargement of the plants “Baggio” in Settimo Milanese (MI), “Cedegolo” (BS), and “Stazzona” in Villa di Tirano (SO), aimed at increasing plant ...

Hydro-electric power plant in Grosotto (SO)

Hydro-electric power plant in Grosotto (SO)

During the hydro-electric re-activation of the Grosotto (SO) plant, the client set up a team of internal and external project specialists. Foppoli Moretta e As...

High Voltage rationalisation programme in Media Valtellina

High Voltage rationalisation programme in Media Valtellina

In the project to increase performance of the electricity network, a new 380 kV power line would be set up with Italo-Swiss interconnectivity in S.Fiorano (BS) ...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab