posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Energy infrastructure › Hydro-electric power plant in Grosotto (SO)

Hydro-electric power plant in Grosotto (SO)

Hydro-electric power plant in Grosotto (SO)

Previous Next

During the hydro-electric re-activation of the Grosotto (SO) plant, the client set up a team of internal and external project specialists.

Foppoli Moretta e Associati was involved as civil hydraulic and structural consultants within the re-activation of power capture at the Le Prese from the Adda River. 

The structural project included the rebuilding of the fluvial crossbar across of the Adda River, new plant management set up, treatment and management of water (water capture, grit removal, fish ladder) up-dating of transport canals (incoming and outgoing) as well as all accessorial projects (service walkways, access points and internal lay out).

Data sheet

  • client: AEM spa - Milan
  • location: Le Prese – Sondalo (SO)
  • type of intervention: re-activation of power capture from the Adda for the hydro-electric power plant in Grosotto (SO)
  • planning: 2004-2005
  • realisation: 2005
  • activities: Civil, Structural and Hydraulic planning
Energy infrastructureEnergy infrastructure
Other projects

Energy infrastructure

Hydro-electric power plant in Mese (SO)

Hydro-electric power plant in Mese (SO)

During the re-powering operations at its hydro-electric plant of Mese, the client requested external consultants to carry out the following operations: moder...

High Voltage rationalisation programme in Media Valtellina

High Voltage rationalisation programme in Media Valtellina

In the project to increase performance of the electricity network, a new 380 kV power line would be set up with Italo-Swiss interconnectivity in S.Fiorano (BS) ...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab