Restoration of Pretorio Palace in Bormio (SO)
The building, historically with a religious function, and now town hall of the Alta Valtellina mountain council, needed to be brought up to date with hygiene, wiring, fire proofing and accessibility standards. The facade was also restored and the top floor was renovated despite it being in constant daily use. This now a listed monument.
In terms of safety procedures during the work, it must be stated that the building remained in full public use during the project with work being carried out in independent zones which would not hinder the overall functioning.
Data sheet
- client: Alta Valtellina mountain council
- location: Bormio (SO)
- type of intervention: restoration and updating to hygiene, fire safety and accessibility standards
- planning: 2005-2007
- realisation: 2007-2008
- activities: architectural and structural planning and construction supervision, Health & Safety co-ordination during planning and work execution
- in partnership with: architect. Carlo Arosio – Lissone (MI)
Category: Design and construction supervision
"Il Prisma" social craftwork co-operative Tirano (SO)
The project foresaw the creation of a new craft workshop unit in the in the industrial district area of Tirano (SO). The building would be more than 700 m2 in ...
Vallecetta River in Valdisotto (SO)
The reduction of hydraulic hazard of Vallecetta River in Valdisotto (SO) included the creation of new weirs in the intermediate section and the re-profiling of ...
Scala and Lenasco Rivers in Sondalo (SO)
To reduce the hydraulic hazard of the Scala River, it was necessary to complete a previously unfinished protection project with heightened left embankment and a...










