posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Design and construction supervision › Scala and Lenasco Rivers in Sondalo (SO)

Scala and Lenasco Rivers in Sondalo (SO)

Scala and Lenasco Rivers in Sondalo (SO)

Previous Next

To reduce the hydraulic hazard of the Scala River, it was necessary to complete a previously unfinished protection project with heightened left embankment and accessorial service completion.

On the Lenasco River, it was necessary to improve the safety of the entire alluvial fan. Work was carried out on its course and that of its tributaries, Raltana and Dombastone with longitudinal banking defence (banks and groynes in rough hewn stone), transversal defence (water level weirs and stone clad weirs) and  improvement of the Adda confluence aimed at optimizing access (water course crossing points, council aqueduct management, run off water management and bridge foundation stabilization at the crossing intersection with the main road).

The interventions were fully designed with low environmental impact forestry engineering techniques.

Data sheet

  • client: Sondrio provincial government
  • location: Sondalo (SO)
  • project: reduction of hydraulic hazard of Scala and Lenasco rivers
  • planning: 2006
  • realisation: 2007-2012
  • activities: preliminary, definitive and executive planning, project management and accounting
Hydro-geological projectsHydro-geological projects
Other projects

Category: Design and construction supervision

Vallecetta River in Valdisotto (SO)

Vallecetta River in Valdisotto (SO)

The reduction of hydraulic hazard of Vallecetta River in Valdisotto (SO) included the creation of new weirs in the intermediate section and the re-profiling of ...

Slope safety plan in Grosio (SO)

Slope safety plan in Grosio (SO)

A number of boulder barriers were installed as detritus blockage points from the mountain towards the Grosio-Fusino road below for a total length of 150 m. The...

School in Madonna di Tirano (SO)

School in Madonna di Tirano (SO)

The project foresaw the early 20th century building of the primary school being updated according to present day conditions of use, specifically the hygiene, wi...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab