Hydro-electric power plant in Mese (SO)
During the re-powering operations at its hydro-electric plant of Mese, the client requested external consultants to carry out the following operations:
- modernization of machinery plant, the historical area of the building, material movement and machinery installation services;
- completion of documentation necessary for renewal of power capture operations on Boggia river (Gordona-SO) and on Crezza river (Menarola-SO) all within the border of the "nature 2000 programme" of Val Bodengo (SIC code IT2040040);
- Health & Safety compliance in areas of potential explosive risk (ATEX);
- Health & Safety co-ordination planning for maintenance in specific plant areas.
Data sheet
- client: EDIPOWER s.p.a. - Sesto S. Giovanni (MI)
- location: Mese, Gordona and Menarola (SO)
- type of intervention: works to be carried out during substitution of generators sets at the Mese hydro-electric plant, maintenance of power capture equipment on the Boggia and Crezza rivers
- period: 2006 - 2009
- activities: executive project, environmental impact report, normative compliance checks, Health & Safety co-ordination during planning
Category: Design and construction supervision
Lavizzari Palace in Mazzo Valtellina (SO)
The building, built and extended in several stages from 16th to 18th century, is split into three separate buildings; the work done concerned the part of the bu...
"Il Prisma" social craftwork co-operative Tirano (SO)
The project foresaw the creation of a new craft workshop unit in the in the industrial district area of Tirano (SO). The building would be more than 700 m2 in ...
Restoration of Pretorio Palace in Bormio (SO)
The building, historically with a religious function, and now town hall of the Alta Valtellina mountain council, needed to be brought up to date with hygiene, w...