parliamentary hall of Montecitorio Palace in Rome
During the removal of the G.A. Sartorio frieze in the parliamentary hall of the Italian House of Parliament at Montecitorio palace, there were seen to be cracks in the masonry behind the frieze itself.
A monitoring system was set up and managed for a year (data logging at monthly intervals) creating a final report containing data sets, graphics and evaluation of the data collected.
Data sheet
- client: Politecnico di Milano - BEST Dept
- location: Rome
- activities: Installation and management of structural monitoring system
- period: October 2006 – September 2007
Category: Testing and monitoring
Rio Bondai medieval bridge in San Lorenzo, Banale (TN)
Bridge masonry work was in an evident state of disrepair and analysis aimed at collecting metric and material information concerning masonry foundation structur...
Robati Palace and annexed farmhouse buildings in Capergnanic...
Diagnostic analysis was carried out to evaluate masonry reinforcement techniques to be adopted in the main building of Palazzo Robati. Analysis was managed a...
Sondrio railway station pedestrian underpass - analysis
Work was carried out to collect geo-technical and hydrological data concerning soil in the project area and geometric, mechanical and tensile data concerning th...











