posta@foppolimoretta.it
+39 0342 704827
ItalianoEnglish
FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
    • About us
    • Team
  • Services
    • Design and construction supervision
    • Structure
    • Technical systems and large-scale projects
    • Safety coordination
    • Testing and monitoring
    • Vulnerability assessment
    • BIM and digital construction process
    • Research and development
  • Portfolio
  • Extra
    • News
    • Video
    • Publications
    • Press review
  • Contacts

Portfolio

Home › Portfolio › Bridges › Alpini bridge in Bassano del Grappa (VI) – Health & Safety co-ordination

Alpini bridge in Bassano del Grappa (VI) – Health & Safety co-ordination

Alpini bridge in Bassano del Grappa (VI) – Health & Safety co-ordination

Previous Next

In order to guarantee the highest level of overall integration, the Health & Safety plan was developed from the analysis of possible project interference coming from the working site itself (internal) as well as from the surrounding environment (external). The phases and indeed, sub-phases of the project were identified including their possible risk factors. Particular attention was paid to interference generated through the presence of the multiple contractors on site, a key factor in safety planning.

The bridge is located in a very challenging, highly urbanised position, firstly, it acts as the fundamental pedestrian crossing point between the historical centre of Bassano and the residential area of Angarano, from a touristic perspective, the bridge is the most popular city sight and from a commercial point of view, many business activities are closely situated.

Further difficulty was added through the condition of the river below, meaning on site work needed to be as swift as possible, with the disrepair of the structure requiring urgent structural attention. All of these risk factors were evaluated when drawing up the safety and co-ordination plan.

Due to evident access difficulties and the urgency of implementation, scuba divers and rope work technicians are foreseen to be used for some operations.

Data sheet

  • client: Bassano del Grappa city council
  • location: Bassano del Grappa (VI)
  • activities: Health & Safety co-ordination during planning and on site execution of the reinforcement of the bridge
  • period: 2015-still in progress
BridgesBridges
Other projects

Bridges

Bridge across the Adda river in Stazzona (SO) - diagnosis and vulnerability assessment

Bridge across the Adda river in Stazzona (SO) - diagnosis an...

A diagnostic analysis was carried out aimed at characterizing and quantifying the degradation status of the bridge, as well as assessing its static structural v...

Ganda bridge in Morbegno (SO) – seismic hazard analysis

Ganda bridge in Morbegno (SO) – seismic hazard analysis

Analysis was carried out to assess static and seismic structural risk factors and was organized as follows: geometric laser scanner survey; analysis of hist...

Vittoria bridge in Bassano del Grappa (VI)

Vittoria bridge in Bassano del Grappa (VI)

Reinforced concrete condition was verified through access and positioning system by ropes. Structural analysis was carried out through sufficient sampling of m...

FOPPOLI MORETTA E ASSOCIATI
società di ingegneria s.r.l.
Piazzetta L. Trombini 5, 23037 Tirano (SO)
C.F. / P.IVA / R.I. 00846800142
Codice INARCASSA SI002933
C.S. € 50 000 i.v

Cookie policy | Privacy Policy
Change your cookie settings

+39 0342 704827
posta@foppolimoretta.it
Reserved Area

© 2026 FOPPOLI MORETTA E ASSOCIATI
  • Home
  • Our company
  • Services
  • Portfolio
  • News
  • Video
  • Publications
  • Press review
  • Contacts

designed by IceLab