Hydro-electric power plant in Grosotto (SO)
During the hydro-electric re-activation of the Grosotto (SO) plant, the client set up a team of internal and external project specialists.
Foppoli Moretta e Associati was involved as civil hydraulic and structural consultants within the re-activation of power capture at the Le Prese from the Adda River.
The structural project included the rebuilding of the fluvial crossbar across of the Adda River, new plant management set up, treatment and management of water (water capture, grit removal, fish ladder) up-dating of transport canals (incoming and outgoing) as well as all accessorial projects (service walkways, access points and internal lay out).
Data sheet
- client: AEM spa - Milan
- location: Le Prese – Sondalo (SO)
- type of intervention: re-activation of power capture from the Adda for the hydro-electric power plant in Grosotto (SO)
- planning: 2004-2005
- realisation: 2005
- activities: Civil, Structural and Hydraulic planning
Category: Structure
Pedestrian square in Livigno (SO)
An elevated pedestrian square was created of more than 300 m2 in Trepalle, near Livingno, at 2069 m asl (probably the highest urban square in Europe). The supp...
Old Chimneys of lime factory in Sarezzo (BS)
The old chimneys of the lime factory in Sarezzo, located in a listed natural area, were in a poor state of conservation following years of abandonment, allied w...