Watering plant of the Middle Valtellina
Project phases were aimed at improving in water management for agricultural purposes as follows:
- the up-grading of cathode protection irrigation systems in the areas of Tresivio, Ponte in Valtellina, Piateda, Chiuro, Teglio, Bianzone and Villa di Tirano;
- the substitution of regulation and control machinery at the “S.Rocco” storage point and Intermediate work on the Valfontana river;
- flow measurement and minimum hydraulic power requirement system installation at Rhon and Valfontana in Ponte in Valtellina and Tresivio;
- re-activation of flow measuring stations at the Boalzo river in Bianzone.
Data sheet
- client: Consorzio di Miglioramento Fondiario Sponda Soliva – Ponte Valtellina (SO)
- location: Ponte Valtellina, Chiuro, Bianzone, Villa di Tirano
- type of intervention: cathode protection up dating; piping, water regulation and management, positioning and start-up of measurement and monitoring systems
- planning: 2009-2010
- realisation: 2010-2011
- services carried out: Planning, on site management, safety co-ordination
Category: Plant and fire proofing
Sondrio hospital: south wing - fire safety planning
The operation foresaw the completion of the Sondrio hospital planning to come up to date with fire-safety norms and obtain the fire safety certification. The p...