Hydro-electric power plant in Mese (SO)
During the re-powering operations at its hydro-electric plant of Mese, the client requested external consultants to carry out the following operations:
- modernization of machinery plant, the historical area of the building, material movement and machinery installation services;
- completion of documentation necessary for renewal of power capture operations on Boggia river (Gordona-SO) and on Crezza river (Menarola-SO) all within the border of the "nature 2000 programme" of Val Bodengo (SIC code IT2040040);
- Health & Safety compliance in areas of potential explosive risk (ATEX);
- Health & Safety co-ordination planning for maintenance in specific plant areas.
Data sheet
- client: EDIPOWER s.p.a. - Sesto S. Giovanni (MI)
- location: Mese, Gordona and Menarola (SO)
- type of intervention: works to be carried out during substitution of generators sets at the Mese hydro-electric plant, maintenance of power capture equipment on the Boggia and Crezza rivers
- period: 2006 - 2009
- services carried out: executive project, environmental impact report, normative compliance checks, Health & Safety co-ordination during planning
Energy infrastructure
Power plants in Baggio (MI), Cedegolo (BS) and Stazzona (SO)
The enlargement of the plants “Baggio” in Settimo Milanese (MI), “Cedegolo” (BS), and “Stazzona” in Villa di Tirano (SO), aimed at increasing plant ...
Hydro-electric power plant in Grosotto (SO)
During the hydro-electric re-activation of the Grosotto (SO) plant, the client set up a team of internal and external project specialists. Foppoli Moretta e As...
High Voltage rationalisation programme in Media Valtellina
In the project to increase performance of the electricity network, a new 380 kV power line would be set up with Italo-Swiss interconnectivity in S.Fiorano (BS) ...